I'm starting concept work today, and I already have a problem. Two related projects are blurring together in my head, and I said so out loud: "I'm starting to muddy the water between Full Loyalty and Rewards MVP, because they DO have" so much overlap. And then I admitted the other thing: "I'm mostly working backwards, because I jumped the gun a bit and started designing solutions."
I'd tell another designer not to do that. The only thing saving me is that every decision is written down, so I can at least check what I jumped to against what we've actually agreed on. Tomorrow I'm untangling these two.